When you install kitchen cabinets, you need to make sure they are straight and that they have enough support behind them so that they can hold all of the contents that you put inside. The first step in installing new cabinets after removing the old ones in the kitchen is to mark the areas on the walls where the cabinets will be placed.
Taking Proper Measurements
Start in one corner to position the first cabinet. Once you have a solid idea as to where it will be installed, place a mark on the wall or the floor so that you remember where the cabinet will go while you complete any preparations pertaining to the design of the cabinet itself. A company in the Concord area that provides kitchen cabinet assembly services can assist in proper measuring and ensuring that there is enough space between each office to allow for opening the doors.
One way to make the installation process a bit easier and faster is to remove the doors and hinges so that you’re only working with the frame instead of the entire cabinet. A company that provides kitchen cabinet assembly services can attach necessary supports to the walls and other materials that will secure the cabinets in place.
Installing Upper and Lower Cabinets
Once the cabinets are ready to install, start with the ones that will go on the wall before those that will go on the floor. This will prevent any dust and debris from getting on the lower cabinets when you’re installing the upper ones. If two cabinets will be joined together, make sure they are securely fastened and clamped together to prevent movement. The backs of the cabinets should be secured before you complete any other work with the installation process. After all of the cabinets are installed in the kitchen, you can then attach the doors and hinges before cleaning the surfaces.
When you’re ready to add new cabinets to your kitchen, view the services that are provided by Lovech Ltd.